Pave Asphalt Co. — Field Report
FY 2025
Square feet paved
0.0M
Commercial lots completed
0
Municipal contracts this year
0

Subdivision streets. Shopping center lots. County road overlays. We finish on time, under budget, and the surface speaks for itself.

See Our Full Project Gallery ↓
Accepting new bids
Client Testimonials & Project Record
Cracked and deteriorated asphalt parking lot showing alligator cracking pattern before resurfacing
BEFORE
Aerial view of freshly paved shopping center parking lot with crisp black asphalt and new line striping
AFTER
Property Manager
Three winters of alligator cracking, two failed patch jobs from the last contractor. Pave came in, milled the whole lot, and laid a surface I'd be comfortable on in ten years. The aerial photos alone were worth framing.
Sandra Kowalski
Property Manager, Redwood Commercial Properties
Columbus, OH
Northgate Plaza Resurfacing
Total Area
62,400 sq ft
Asphalt Laid
840 tons
Days on Site
9 days
Completed
3 days early
General Contractor
We sub paving to Pave on every commercial site job we bid. They hit every milestone, the tonnage always matches the ticket, and I've never had an owner callback on their work.
Derek Mulvane
Project Executive, Mulvane Site Construction
Indianapolis, IN
Clearwater Business Park Phase 2

New construction. 4.2 acres of internal roads and parking. 4" base, 2" intermediate, 1.5" surface. Curb and gutter coordination.

Site Area
4.2 acres
Total Asphalt
2,180 tons
Road Lanes
1,640 lin. ft
Schedule
On time
Commercial business park with smooth new asphalt roads and parking areas under clear sky
— Ready to move forward?

Your lot isn't getting
younger.

See Our Full Project Gallery
Freshly paved rural county road with crisp asphalt surface stretching into the distance through green fields
Municipal Engineer
Budget closes September 30th. I had 2.1 miles of County Road 14 that needed overlay before the freeze. Pave mobilized in four days and finished with a week to spare. The smoothness index came back at 94.
Tom Harrington, P.E.
County Road Engineer, Franklin County Public WorksUnionville, OH
CR-14 Overlay Project
Road Length
2.1 miles
Overlay Depth
2 inches
Smoothness IRI
94 / 100
Finished
7 days early
Mobilized Day 4 of 30. Demobilized Day 23.7 days early
Mobilize30-day window
Largest single job
5,640 T
tons of asphalt, single project
Pad Area
304,920 sq ft
Asphalt Tonnage
5,640 tons
Large industrial distribution center truck court with smooth heavy-duty asphalt surface and dock approach
Industrial GC
Pave handled the entire 7-acre pad on Westfield Distribution. Paving crew was 18 strong, running two pavers in echelon. Longitudinal joint was as tight as I've seen on a job this size.
Craig Ostrowski
Senior Project Manager, Apex Industrial Builders
Mix Design
80k lb axle
Pavers Running
2 echelon
— Still deciding?

Every day costs you
cracked pavement.

See Our Full Project Gallery
New subdivision street with freshly laid black asphalt surface, clean curbs, and residential homes in background
General Contractor
Pave did all 14 streets in Maple Ridge Phase 3. The HOA board walked the punch list and had zero comments. That's never happened on a subdivision job in my 22 years.
Lisa Brennan
VP Land Development, Stonecroft Homes
Westerville, OH
Maple Ridge Phase 3 — Street Paving
Streets Paved
14 streets
Linear Feet
12,840 lin. ft
Driveway Cuts
186 approaches
Punch List
0 items
Now Accepting Bids — Q1 2026

The surface
says everything.

If you're bidding commercial site work, managing a lot that's cracked through three winters, or need overlay before budget closes — send us the specs. We'll have a number back to you in 24 hours.

See Our Full Project Gallery
2.4Msq ft paved 2025
187commercial lots
14municipal contracts
24hrestimate turnaround